Pause/Resume Downloads (especially for stalled/failed) #7261

Open
opened 2021-10-23 06:59:10 +02:00 by rambo919 · 1 comment
rambo919 commented 2021-10-23 06:59:10 +02:00 (Migrated from github.com)

I commonly have instances (these days with 80-90% of attempted downloads) of the download simply silently failing and staying stuck at any percentage of downloaded.

Then I have to kill all lbry instances, restart them and restart the download from scratch. Due to the huge sizes (2+GB for 50min+) of the downloads that I cannot set (I have to reconvert them to smaller size afterwards myself) this means a single download can take anything from an hour to all day with constant kill/restarts until I finally downloaded the thing.

I cannot use a separate download manager because almost none of the videos show a "save video as" that is not greyed out in an internet browser.

Same problem with multiple channels so the easiest fix is a button to pause/resume? Adding smaller download options won't fix the problem as much as alleviate it.

I commonly have instances (these days with 80-90% of attempted downloads) of the download simply silently failing and staying stuck at any percentage of downloaded. Then I have to kill all lbry instances, restart them and restart the download from scratch. Due to the huge sizes (2+GB for 50min+) of the downloads that I cannot set (I have to reconvert them to smaller size afterwards myself) this means a single download can take anything from an hour to all day with constant kill/restarts until I finally downloaded the thing. I cannot use a separate download manager because almost none of the videos show a "save video as" that is not greyed out in an internet browser. Same problem with multiple channels so the easiest fix is a button to pause/resume? Adding smaller download options won't fix the problem as much as alleviate it.
jessopb commented 2021-10-25 17:46:38 +02:00 (Migrated from github.com)

Thanks for the push - this feature is close, and the pause and start rpc calls already exist.
Should be able to get to this soon after the next release.

Thanks for the push - this feature is close, and the pause and start rpc calls already exist. Should be able to get to this soon after the next release.
Sign in to join this conversation.
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference: LBRYCommunity/lbry-desktop#7261